PROJECT DESCRIPTION: Airport Runway Construction Roads 2000 are responsible for overseeing the delivery of; Asphalt Linemarking CONTRACT SUMMARY Roads 2000 has been selected to deliver upgrades to RAAF Base Pearce to support the introduction of the new Boeing P-8A Poseidon aircraft into service. Located 35 kilometres north of Perth, RAAF Base Pearce will be an important…
Category: Metro
As the existing surface came to the end of its useful life, Mirrabooka Ave required road rehabilitation. Mirrabooka Avenue is a critical part of the road network to residents in the Northern suburbs. the road rehabilitation scope included; Supply & Lay Asphalt Profile & Dispose of Surface Other Ancillary Services – Traffic Management, Sweeping, Linemarking…
Working in conjunction with the City of Wanneroo, Roads 2000 collaborated to deliver a proactive approach to reduce congestion. The Marmion & Hester Ave Roundabout is a critical part of the road network to residents in the Northern suburbs. Works took place at night under complex TMP instructions. The scope included; Supply & Lay Asphalt…
The City of Wanneroo is one of the fastest growing local governments in Australia. With over 200,000 residents, we understand the importance of minimizing the hassle to stakeholders when completing projects. During the upgrade program, our team was responsible for delivering; Supply & Lay Asphalt Works — 10mm 50MB Dense Grade Asphalt (>1,800t) Supply &…
Scope: Modified and widened the existing 4-way intersection to construct a roundabout. Resurfaced approximately 1000m2 of residential pavement with 30mm thick of 10mm 75 blow dense grade asphalt, upgraded existing drainage components and installed new drainage infrastructure; installed kerbing, concrete footpath, faux paving and tactile pavers to crossings.
Anura Rathnayake – Operations Engineer – City of Stirling: ROW 29003/29002 has been constructed according to the plans provided by the city. The finished lane way was in accordance with the cities standards and specifications. Contractor Roads 2000 has completed the work within the given period of time with compliance to standards and requirements. Roads…
Over 11,200 square metres of existing road was profiled out and 1,300 Tons of new asphalt was laid.
Roads 2000 embarked on a project to cover all of its bulk storage bins. The project was completed in July 2014. The shelters demonstrate how important it is to show environmental leadership among industries in Wangara and to go beyond the expectations of our environmental licence.