MRWA complete annual regional resurfacing works throughout WA. Roads 2000’s ability to meet stringent testing and specification with faultless compliance is part of our commitment. Supply & Lay Asphalt Works — 14mm 75MB & 10mm 75MB (MRWA Approved Mix Designs) Supply & Install Sealing – SAMI Seal Ancillary Services — Project Management, Profiling, Traffic Management…
Projects

BHP’s South Flank Mine is located in the heart of the Pilbara. Roads 2000 were engaged to complete mobile asphalt production and paving to construct roadways, carparks and hardstands. Supply & Lay Asphalt Works — 14mm 75MB + A15E (BHP Specification) Ancillary Services — Project Management, Line Marking & Kerbing

The Nova Operation is located approximately 160km east of Norseman, in remote Western Australia. Mobile Asphalt works were carried out to ensure high quality and product longevity. Supply & Lay Asphalt Works — 14mm 75MB MRWA Ancillary Services — Project Management, Stabilisation & Civil Works Resurfacing of roadways was completed swiftly ensuring minimal downtime and…

Roads 2000 deliver high quality results on remote asphalt projects. The reconstruction of the Leinster Airstrip and upgrades to Mt Keith and Leinster’s town sites required our mobile asphalt plant. The project delivery team provided great quality product and service to our client. Supply & Lay Asphalt Works — 14mm 5oMB Intersection Mix Supply &…

The City of Wanneroo is one of the fastest growing local governments in Australia. With over 200,000 residents, we understand the importance of minimizing the hassle to stakeholders when completing projects. During the upgrade program, our team was responsible for delivering; Supply & Lay Asphalt Works — 10mm 50MB Dense Grade Asphalt (>1,800t) Supply &…

Scope: Modified and widened the existing 4-way intersection to construct a roundabout. Resurfaced approximately 1000m2 of residential pavement with 30mm thick of 10mm 75 blow dense grade asphalt, upgraded existing drainage components and installed new drainage infrastructure; installed kerbing, concrete footpath, faux paving and tactile pavers to crossings.

Anura Rathnayake – Operations Engineer – City of Stirling: ROW 29003/29002 has been constructed according to the plans provided by the city. The finished lane way was in accordance with the cities standards and specifications. Contractor Roads 2000 has completed the work within the given period of time with compliance to standards and requirements. Roads…

Over 11,200 square metres of existing road was profiled out and 1,300 Tons of new asphalt was laid.